Laserfiche WebLink
Natural Soda LLC 2023 Project Status Report & Annual Plan of Development <br /> 20 January 2024 <br /> <br />4.2. New Findings or Developments (Confidential) <br />• One new 3 acre well pad and 1,600 foot access road were constructed for the <br />proposed 18H-1V slant production well. A new pipeline was fabricated <br />proximal to the access road to connect the 18H-1V to plant operations. An <br />existing pad, 15H-17H West was extended to the South by 2 acres for the <br />proposed 18H-IR-W well. <br />• NS P&A’ed the GMW wells associated with the Rock School Lease; AM-2, <br />MWA-2, MWB-2, MWD-1, MWD-2, MWU-2 and the RS-96-20-1. <br />• NS P&A’ed three production wells; 14H-R(I), 15H-I, and the 17H-I. <br />• In 2023 NS began sampling DS Aquifer GMWs that do not have nitrogen lift <br />pumps by utilizing a wireline deployed discrete zone sampling tool. <br />