Laserfiche WebLink
Technical Memo  Page 10 August 16, 2024 <br />Peabody – CDPS Permit Supplement <br />and Total Maximum Daily Load (TMDL) Programs. EPA-823-D-21-003. Office of <br />Water, Washington, D.C. October 2021. <br />EPA. 2024a. Technical Support for Adopting and Implementing the EPA’s 2016 Selenium <br />Criterion in Water Quality Standards. EPA 820-R-24-001. Office of Water, <br />Washington, D.C. April 2024. <br />EPA. 2024b. Technical Support for Fish Tissue Monitoring for Implementing the EPA’s 2016 <br />Selenium Criterion. EPA 820-R-24-003. Office of Water, Washington, D.C. April 2024. <br />EPA. 2024c. Frequently Asked Questions: Implementing Water Quality Standards Based on <br />the EPA’s 2016 Selenium Criterion in Clean Water Act Section 402 National Pollutant <br />Discharge Elimination System Permits. EPA 820-R-24-002. Office of Water, <br />Washington, D.C. April 2024. <br />EPA. 2024d. Frequently Asked Question: Implementing the EPA’s 2016 Selenium Criterion <br />in Clean Water Act Sections 303(d) and 305(b) Assessment, Listing, and Total Maximum <br />Daily Load Programs. EPA 820-R-24-004. Office of Water, Washington, D.C. April <br />2024. <br />Mississippi Department of Environmental Quality (MDEQ). 2023. Mississippi Lignite <br />Mining Company, National Pollutant Discharge Elimination System Permit <br />Modification No. MS0054046. April 3, 2023.