Laserfiche WebLink
RECEIVED <br /> SEP 0 3 2025 <br /> Colorado Division of Reclamation, <br /> Mining and Saftey <br /> Castle Aggregate <br /> August 29, 2025 <br /> Division of Reclamation Mining and Safety <br /> Department of Natural Resources <br /> Denver Colorado <br /> Attn: Hunter Ridley <br /> RE: Pikeview Quarry Permit#M-1977-211 <br /> Dear Hunter, <br /> Please accept our application to release the final bond currently held for this Quarry. <br /> 1. Grates have been installed over the existing stand pipes at the base of the quarry. <br /> 2. Grading at the outlet of the Stand pipes is complete. <br /> 3. Rip rap channel ate the north road has been reshaped to allow the channel to direct the water flow back <br /> into the channel and continue to the east. <br /> 4. Sparse areas of vegetation have been reseeded with the new grass seed mix from Granite Seed,as we <br /> discussed. <br /> 5. Weed Spraying program has been continued through ought the summer and will complete on Sept 26 <br /> 2025. <br /> 6. Water seeping from the upper peaks is being directed to a guzzler lower on the slope and the existing <br /> erosion holes have been filled. <br /> 7. South Boundary to the USFS property has been permanently blocked with berms and boulders as directed <br /> by the USFS <br /> 8. Stantec is preparing the final technical revision for the completed project and will submit by Sept 26,2025 <br /> As we complete these tasks from the last inspection before the Sept 26, 2025 due date,we respectfully ask for a <br /> final and complete release from the permit referenced. <br /> Sincerely, <br /> P sdo e <br /> Jerald Schnabel, <br /> Castle Aggregate <br /> Site: 7250 Allegheny Drive, Colorado Springs CO 80919 <br /> Email:Jerald Schnabel@castleaggresate.com <br /> Cell 719-491-0114 <br />