Laserfiche WebLink
8. Water Consumption and Source <br /> Water for dust control will be the primary consumptive use at the site. Water will be purchased <br /> from legal sources during operations. Table G-3 summarizes the estimated water consumption <br /> for the operation throughout the year. <br /> Table G-3. Water Consumption <br /> Dust Evaporative Water Removed Total <br /> Month Control Depletions from Mining <br /> (ac-ft) (ac-ft) (ac-ft) (ac-ft) <br /> Jan 0.11 0.00 0.00 0.1 <br /> Feb 0.12 0.00 0.00 0.1 <br /> Mar 0.19 0.00 0.00 0.2 <br /> Apr 0.32 0.00 0.00 0.3 <br /> May 0.42 0.00 0.00 0.4 <br /> Jun 0.51 0.00 0.00 0.5 <br /> Jul 0.53 0.00 0.00 0.5 <br /> Aug 0.47 0.00 0.00 0.5 <br /> Sep 0.35 0.00 0.00 0.4 <br /> Oct 0.25 0.00 0.00 0.3 <br /> Nov 0.14 0.00 0.00 0.1 <br /> Dec 0.11 0.00 0.00 0.1 <br /> Total 3.50 0.00 l 0.00 3.5 <br /> Yampa Valley Gravel Pit <br /> August 2025 G-4 ii Lewicki&Associates <br />