Laserfiche WebLink
CIVIL RESOURCES <br /> Cell 4 Lined Cell Without Mitigation <br /> Well Base Cell 4 Difference Cell(IJK) <br /> PZ-01 4,712.3 4,712.5 0.2 _ 146,111,1 <br /> PZ-04 4,712.4 4,712.3 -0.1 136,119,1 <br /> PZ-09 4,725.4 4,727.7 2.3 142,136,1 <br /> PZ-15 4,724.4 4,724.3 -0.1 153,136,1 <br /> PZ-20 4,737.8 4,737.4 -0.4 _ 162,133,1 <br /> PZ-25 4,733.1 4,733.7 0.6 162,115,1 <br /> PZ-27 4,741.2 4,741.9 0.7 148,122,1 <br /> In conclusion, the updated model run demonstrates that construction of the Cell 4 slurry wall prior to construction of the <br /> proposed mitigation structures will cause mounding below the threshold outlined in the Monitoring and Mitigation Plan. <br /> Due to the limited mounding and distance to surrounding below grade structures, it is not anticipated that the <br /> construction of the Cell 4 slurry wall will cause a negative effect to the surrounding property owners. <br /> We appreciate your review. Should you have any questions, please contact us. <br /> Sincerely, <br /> CIVIL RESOURCES, LLC. <br /> Cc: Eric Leigh <br /> Attachments: <br /> Figure TR-3 <br /> J:\Quikrete-282\Monarch DENM\DRMS\TR-03\TR03 Letter-DRAFT.doc <br />