My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-08-20_REVISION - M2009027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009027
>
2025-08-20_REVISION - M2009027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 9:46:26 AM
Creation date
8/20/2025 12:18:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009027
IBM Index Class Name
Revision
Doc Date
8/20/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
The Walsenburg Sand and Gravel Company
Type & Sequence
SI1
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 003 Page 2 of 2 <br /> <br /> <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.900 (SSD-FC) <br />Push gradient: 0.903 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 1.438 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.8803 <br /> <br />Adjusted unit production: 433.02 LCY/hr <br />Adjusted fleet production: 433.02 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.809/LCY <br /> <br />Total job time: 47.53 Hours <br />Total job cost: $16,646 <br />
The URL can be used to link to this page
Your browser does not support the video tag.