Laserfiche WebLink
Loader Worksheet Cont’d Task # 002 Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br /> <br />Total Travel Time: 1.3365 minutes <br />Total Cycle Time: 1.8915 minutes Load Bucket Capacity Rated Capacity: 9.20 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100-120%) 1.100 <br />Adjusted Capacity: 10.12 LCY Job Condition Correction Factors <br />Site Altitude: 6050 feet Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier Unadjusted Hourly Unit Production: 321.02 LCY/Hour <br />Adjusted Hourly Unit Production: 266.45 LCY/Hour <br />Adjusted Hourly Fleet Production: 266.45 LCY/Hour <br /> <br />JOB TIME AND COST Fleet size: 1 Loader(s) Total job time: 34.40 Hours <br /> <br />Unit cost: <br /> <br />$1.137 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$10,424 <br />