My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-08-20_REVISION - M2009027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009027
>
2025-08-20_REVISION - M2009027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 9:46:26 AM
Creation date
8/20/2025 12:18:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009027
IBM Index Class Name
Revision
Doc Date
8/20/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
The Walsenburg Sand and Gravel Company
Type & Sequence
SI1
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> <br />Task description: Mobilization/DeMobilization Site: WSG-Hribar Permit Action: 2025 Insp/AM1 Info Permit/Job#: M2009027 <br /> <br />PROJECT IDENTIFICATION Task #: 007 State: Colorado Abbreviation: None <br />Date: 7/17/2025 County: Huerfano Filename: 7 <br />User: AMG Agency or organization name: DRMS <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $21.47 $38.32 $48.96 <br />Operating Cost/Hour: $31.47 $60.11 $65.86 <br />Operator Cost/Hour: $22.52 $22.52 $22.52 <br />Helper Cost/Hour: $0.00 $22.25 $22.25 <br />Total Unit Cost/Hour: $75.46 $143.20 $159.59 <br /> <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Description <br />Weight/ <br />Unit <br />(TONS) <br />Owner ship <br />Cost/hr/ unit <br />Haul Rig <br />Cost/hr/uni <br />t <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ <br />fleet <br />Return Trip Cost/hr/ fleet DOT Permit Cost/ fleet <br />Cat D8T - 8SU 47.71 $179.60 $143.20 1 $322.80 $143.20 $250.00 <br />CAT 140M 16.68 $54.63 $75.46 1 $130.09 $75.46 $250.00 <br />CAT 988H 54.46 $140.90 $159.59 1 $300.49 $159.59 $250.00 <br />Drill/Broadcast <br />Seeder with <br />Tractor <br />25.00 $5.99 $75.46 2 $162.90 $150.92 $500.00 <br /> <br />Subtotals: $916.28 $529.17 $1,250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ <br />unit <br />Fleet Size Haul Trip <br />Cost/hr/ fleet <br />Return Trip Cost/hr/ fleet <br />Water Tanker, 2,500 Gal. $54.49 1 $54.49 $54.49 <br />Light Duty Pickup, 4x4, 3/4 T. $127.20 1 $127.20 $127.20 Subtotals: $181.69 $181.69 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.