Laserfiche WebLink
-4- <br /> 12. Primarr future(Post-mining)land use(check one): <br /> I Cropland(CR) El Pastureland(PL) _L....! General Agriculture(GA) <br /> El Rangeland(RL) _E Forestry(FR) Wildlife Habitat(WL) <br /> fl Residential(RS) JJ Recreation(RC) Industrial/Commercial(IC) <br /> -1"1 Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primar resent land use check one : <br /> 0 Cropland(CR) Pastureland(PL) X General Agriculture(GA) <br /> Ea Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS)H_ <br /> Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): Open pit mining using dozers, scrapers, <br /> excavators, and haul trucks. <br /> 15. On Site Processing: © Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel):There will be a designated processing area where haul <br /> trucks deliver material that is loaded by excavators into aggregate crushing and washing machines. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: N/A <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />