revision detailing the location of river armoring or inflow/outflow structures will be secured. See <br /> Exhibit G for details on surface water protection. <br /> Processing of the mined materials will include aggregate washing, crushing, asphalt, and <br /> concrete production. Water for these purposes will be sourced from ponds and/or groundwater <br /> wells located in or around the processing area. Prior to construction and use of water from these <br /> sources, necessary permits and augmentation plans will be acquired. <br /> No blasting will occur at the P123 Mine. If refuse, acid, or toxic materials are unexpectedly <br /> encountered, these materials will be removed from the site and disposed of appropriately. <br /> 2. Mining Timetable <br /> Mining operations at the P123 Mine are expected to take approximately 16 years to complete, <br /> based on an annual average production of 500,000 tons. Actual production rates will fluctuate <br /> based on market conditions. An approximate mining timetable based on this production and the <br /> phased mining plan is shown in Table D-2. <br /> Table D-1 Mining Timetable <br /> Description Time Required(years) <br /> Construction of slurry wall 1. 0.5 <br /> Initial stripping of Pod 1. 0.2 <br /> Mine and reclaim Pod 1 according to approved plans. <br /> Reclamation occurs as mining has reached its maximum 7.0 <br /> extents in an area. <br /> Construction of slurry wall 2. 0.5 <br /> Initial stripping of Pod 2. 0.2 <br /> Mine and reclaim Pod 2 according to approved plans. <br /> Reclamation occurs as mining has reached its maximum 5.2 <br /> extents in an area. <br /> Construction of slurry wall 3. 0.5 <br /> Initial stripping of Pod 3. 0.2 <br /> Mine and reclaim Pod 3 according to approved plans. <br /> Reclamation occurs as mining has reached its maximum 1.7 <br /> extents in an area. <br /> Total 16.0 <br /> P123 Mine <br /> July 2025 D-2 Lcwicki&Associates <br />