Laserfiche WebLink
<br />TR-54 Revised 3/25 <br /> <br />27 <br />TABLE 15-8 <br />Ground Water Monitoring Frequencies <br />Yoast Mine <br />(Continued) <br /> <br />Site Name Water Levels Water Quality <br />_____________________________________________________________________________________ <br />YTM32 (Shop Well) Discontinue Annual A <br />SGAL70 (Seneca II Well GW-S70-A) Discontinue Annual - A (POC) <br /> <br />- Indicates no monitoring <br /> <br />Annual: May/June <br />Semiannual: May/June, September/October <br /> <br />Water samples will be analyzed according to the (A) Ground Water Long Parameter List (Table <br />15-4) or the (B) Ground Water Short Parameter List (Table 15-4a). <br /> <br />Wells with a strikethrough, and an ‘Abandon’ in the ‘Water Levels’ column, will be abandoned. <br />(A)Contingent upon SCC's decision to put this well into service. <br /> <br /> <br />