Laserfiche WebLink
RULE 2 PERMITS <br /> <br />South Taylor – Rule 2, Page 1 Revision Date: 7/21/25 <br /> Revision No.: MR-267 <br />RULE 2 – PERMITS <br /> <br />2.01 GENERAL REQUIREMENTS <br /> <br />The information provided in the subsections of Rule 2.01 of the original permit is specifically applicable <br />to the South Taylor permit revision area. Information regarding the existing Colowyo Mine permit area is <br />located in Rule 2 of Volume 1 and other referenced areas. <br /> <br />2.01.1 – 2.01.3 Scope and General Requirements <br /> <br />These sections are addressed in the existing permit, Rule 1, Volume <br /> <br />2.01.4 Permit Requirements for New Surface Coal Mining and Reclamation Operations <br /> <br />The Colowyo Mine is an existing mine operation; therefore, the requirements of this Section are not <br />applicable. <br /> <br />2.01.5 Permit Term <br /> <br />Please see Volume 1, Section 2.01.5. <br /> <br />2.01.6 Permit Fees <br /> <br />Please see Section 2.01.6 in Volume 1. <br /> <br />2.02 GENERAL REQUIREMENTS FOR COAL EXPLORATION <br /> <br />These sections are addressed in Volume 1, Section 2.02. <br /> <br />2.03 LEGAL, FINANCIAL, AND COMPLIANCE INFORMATION <br /> <br />2.03.1 Objective <br /> <br />The objective of this section is to insure that the Division receives all relevant information regarding <br />ownership and control of surface coal mining operations, the ownership and control of the property to be <br />affected by those operations, the compliance status and history of Colowyo, and other information <br />relevant to the South Taylor permit revision. <br /> <br />2.03.2 Responsibilities <br /> <br />Within this application, Colowyo has provided the Division with information for approval of a coal <br />mining and reclamation permit for mining activities to be completed at the South Taylor Permit Area <br />under the requirements of the Colorado regulations for coal mining. The information provided in this <br />document is limited to the information required for a revision of the existing permit to include the South <br />Taylor mining area into the existing permit area. Refer to the existing permit application (Volume 1) for <br />general information that required no modification to include the South Taylor area. The format will <br />parallel the Colorado coal mining regulations. This application focuses on the requirements of Rule 2, <br />specifically Rule 2.04, Rule 2.05, and certain aspects of Rule 2.01, 2.02, 2.03, and 2.06; Rule 3 – <br />Performance Bond Requirements; and Rule 4 – Performance Standards. <br />