My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-30_PERMIT FILE - C1981019 (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-07-30_PERMIT FILE - C1981019 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 2:53:20 PM
Creation date
8/12/2025 2:50:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
7/30/2025
Section_Exhibit Name
Rule 4 Performance Standards -ST
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />South Taylor – Rule 4, Page 13 Revision Date: 7/21/25 <br /> Revision No.: MR-267 <br /> <br /> <br />4.23 AUGER AND HIGHWALL MINING <br /> <br />4.23.1 Scope <br /> <br />This Section establishes environmental protection performance standards in addition to those applicable <br />performance standards in Rule 4, to prevent any unnecessary loss of coal reserves and to prevent adverse <br />environmental effects from auger mining incident to surface mining activities. <br /> <br />4.23.2 Maximize Recoverability of Mineral Reserves <br /> <br />Colowyo has identified areas suitable for highwall mining at South Taylor (Map 23). Highwall mining allows <br />for the recovery of additional coal resources beyond the final pit highwalls and end-walls. These coal <br />reserves are economically recoverable using highwall mining methods. <br /> <br />From a strip mining perspective, the South Taylor Pit clearly delineates the maximum recoverable coal <br />resources attainable today with modern surface technology and coal market demand and pricing. The <br />highwall mining of the G-seams on the west side of the pit represents recovery of reserves that would not <br />have been recovered by any other means utilizing either surface or underground mining techniques. <br />Section 4.23 of Volume 1 contains additional discussion regarding the removal of coal using highwall mining <br />methods. The document includes a summary of the geologic factors that limit removal of the coal using <br />conventional methods, the requirements for leaving undisturbed areas of coal in un-mined sections, <br />procedures for working around underground mines, surface and groundwater pollution prevention procedures, <br />reduction in fire hazards, backfilling, grading, and PMT requirements for all areas previously permitted. <br /> <br />4.23.2(1) Undisturbed Areas of Coal Shall Be Left in Unmined Sections <br /> <br />As for the rules requirements [Rules 4.23.2(1)(a)-(c)] for leaving undisturbed areas of coal in unmined <br />sections, Colowyo requests a variance from the requirements of this rule for the South Taylor Pit. Colowyo’s <br />highly successful highwall mining methods that have been used and will be in the future in the South Taylor <br />Pit, will maximize production and ensure no subsidence occurs. Using this particular method of highwall <br />mining by leaving pillars and barriers allows the seams to be mined below each other and still ensures <br />geologic stability once all seams have been mined out. Please see Exhibit 27, Item 6 and Item 7 in Volume <br />20 for further discussion on the geotechnical design and operational considerations implemented highwall <br />mining the South Taylor Pit. <br /> <br />4.23.2(2) Abandoned or Active Underground Mine Workings <br /> <br />No abandoned or active underground mine workings have ever existed or currently exist in any of the coal <br />seams in the areas to be highwall mined. Highwall mining will not take place within 500 feet of any <br />abandoned or active underground mining operation. <br /> <br />4.23.2(3) Surface Mining Activities and Highwall Mining <br /> <br />The highwall mining shall follow the surface coal mining activities in a contemporaneous manner consistent <br />with the applicable requirements of Division Rule 4. Due to active pit progressions and sequencing of mining <br />(in addition to meeting the Permit requirements for contemporaneous reclamation), it is required that highwall <br />mining occurs timely if not immediately following conclusion of pit mining activities. Also, as described <br />more fully in 2.06.9(2), the need to backfill, is mandatory for Colowyo in order to build the pit floor from <br />which to work from to mine the successively higher (in the geologic column) coal seam. Hence successful <br />highwall mining is in part dependent upon timely backfill of the pit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.