Laserfiche WebLink
Previous Bond Release Summary <br /> Bond Release Phase Submittal Approval Date <br /> Date <br /> SL-01 I and 11 7/2/1987 10/8/1987 <br /> SL-02 I 9/25/1997 4/27/1998 <br /> SL-03 II 9/26/2000 8/15/2001 <br /> SL-04 I and 11 6/1/2001 7/25/2001 <br /> SL-05 III 6/28/2010 7/25/2012 <br /> SL-06 I 4/26/2012 4/9/2013 <br /> SL-07 I 4/2/2013 8/29/2013 <br /> SL-08 I 5/20/2015 1/7/2016 <br /> SL-09 I 2/29/2016 9/28/2016 <br /> SL-10 III 7/18/2016 1/12/2017 <br /> SL-11 I 3/10/2017 11/13/2017 <br /> SL-12 II and III 3/10/2017 12/7/2017 <br /> SL-13 I 4/12/2018 8/30/18 <br /> SL-14 II and III 5/24/18 11/24/18 <br /> SL-15 I, II, and III 2/8/19 9/10/19 <br /> SL-16 I, II, and III 6/26/19 11/26/19 <br /> SL-17 I, II, and III 9/26/19 1/25/20 <br /> SL-18 I 3/20/20 8/22/20 <br /> SL-19 11 7/22/20 10/26/20 <br /> SL-20 I 4/13/21 5/28/21 <br /> SL-21 I 2/28/22 6/24/22 <br /> SL-22 H 7/13/2023 11/3/2023 <br /> SL-23 I,H,and III 1 9/16/2024 1/22/2025 <br /> See Exhibit 2A of the Colowyo Mine Annual Reclamation Report for the locations of the previous <br /> Phase I, 11 and III Bond Release areas at the Colowyo Coal Mine. See Table 1 in this document for the <br /> previous bond release acreages and Table 2 in this document for the previous bond release amounts. <br /> III. CRITERIA AND SCHEDULE FOR BOND RELEASE <br /> PHASE I <br /> The Division evaluated Colowyo's request for partial Phase I Bond Release on 145.9 acres in the West Pit, <br /> north and east of the Collom Pit, and northeast of the Gossard Loadout facility, as referenced in the SL-24 <br /> application and as shown on Figure 1 of this document. The process of releasing the reclamation bond for a <br /> coal mine site in Colorado is explained in Rule 3.03 and further described in the Division's 1995 Guideline <br /> Regarding Selected Coal Mining Bond Release Issues. The bond release process involves three phases. At <br /> Phase 1, Rule 3.03.1(2) (a) states, "Up to sixty percent of the applicable bond amount shall be released when <br /> the permittee successfully completes backfilling, regrading, and drainage control in accordance with the <br /> Proposed Decision and Findings of Compliance <br /> Partial Phase I Bond Release SL-24 Page 5 of 14 <br />