My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-21_HYDROLOGY - M2008082 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2025-07-21_HYDROLOGY - M2008082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 7:37:04 AM
Creation date
7/30/2025 10:02:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
7/21/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Morton Lakes Substitute Water Supply Plan Renewal (Amended) <br /> July 21, 2025 <br /> Page 14 of 17 <br /> Applicant shall not receive credit for replacement of depletions to the South Platte <br /> below such diversion structures unless bypass and measurement structures are in <br /> place to allow the Division Engineer and Water Commissioner to confirm that <br /> Applicant's replacement water is delivered past the headgates. In the event that <br /> delivery past dry-up points requires the use of a structure for which a carriage or use <br /> agreement with a third party is required, Applicant shall be responsible for securing <br /> such agreement. Until such time as the Applicant provides a copy of the carriage or <br /> use agreement to the Division Engineer and Water Commissioner, no credit will be <br /> allowed for replacement of depletions to the South Platte below such diversion <br /> structure. The Division of Water Resources will not be responsible for any <br /> enforcement or administration of third party agreements that are not included in a <br /> decree of the water court. <br /> 17.The name, mailing address, and phone number of the contact person who will be <br /> responsible for operation and accounting of this plan must be provided on the <br /> accounting forms to the Division Engineer and Water Commissioner. <br /> 18.Dewatering at this site will produce delayed depletions to the stream system. <br /> Dewatering operations must be measured by totalizing flow meters that can <br /> accurately show the monthly volume of dewatered water that is pumped and returns <br /> to the stream. At least three years prior to completion of dewatering, a plan must be <br /> submitted that specifies how the post pumping dewatering depletions (including <br /> refilling of the pit) will be replaced, in time, place and amount. <br /> 19.The Applicant must replace all depletions resulting from operations under this SWSP, <br /> including those depletions that are owed to the stream after the expiration date of <br /> this SWSP. The Applicant must maintain a valid SWSP approved under section 37-90- <br /> 137(11 ), C.R.S. until all lagged replacement obligations resulting from the gravel pit <br /> operation have been fully replaced in time, location, and amount. <br />
The URL can be used to link to this page
Your browser does not support the video tag.