My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-21_HYDROLOGY - M2008082 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2025-07-21_HYDROLOGY - M2008082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 7:37:04 AM
Creation date
7/30/2025 10:02:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
7/21/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Morton Lakes Substitute Water Supply Plan Renewal (Amended) <br /> July 21, 2025 <br /> Page 12 of 17 <br /> 5. The total product mined at the Morton-Holton Lakes associated with a 2% depletion, <br /> as described above, shall not exceed 450,000 tons, resulting in a total depletion of <br /> 6.49 acre-feet. <br /> 6. The total water used for final construction of Stage 5 shall not exceed 41.98 acre- <br /> feet. <br /> 7. The total consumptive use under this SWSP shall not exceed 105.30 acre-feet and the <br /> total lagged depletions shall not exceed 110.17 acre-feet. <br /> 8. Total consumption and lagged depletions at the Morton-Holton Lakes site must not <br /> exceed these aforementioned amounts unless an amendment is made to this SWSP. <br /> 9. Approval of this SWSP is for the purposes as stated herein. This office must first <br /> approve any additional uses for the water. <br /> 10.All pumping for dust control shall be measured in a manner acceptable to the Division <br /> Engineer. <br /> 11 .All water diverted from the stream for final reservoir construction at Stage 5 shall be <br /> measured in a manner acceptable to the Division Engineer. The Applicant must obtain <br /> approval of the measurement and recording device prior to diverting water. The <br /> Applicant must also obtain approval from the Water Commissioner prior to any <br /> diversions occurring. <br /> 12.The Applicant should consider the effects of groundwater mounding and the need for <br /> interceptor drains due to construction of the liners around the pits. <br /> 13.The replacement water that is the subject of this SWSP cannot be sold or leased to <br /> any other entity. As a condition of subsequent renewals of this SWSP, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.