My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-18_REVISION - M2007006
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007006
>
2025-07-18_REVISION - M2007006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 9:18:11 AM
Creation date
7/29/2025 9:15:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007006
IBM Index Class Name
Revision
Doc Date
7/18/2025
Doc Name
Returned Mail
From
DRMS
To
Jodi Schreiber - John P. Ary Fremont paving & Redi-Mix, Inc.
Type & Sequence
SI2
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#004 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Spread topsoil over 46 acres <br /> Site: Ted Franciscotti Pit#1 Permit Action: TR2 Permit/Job#: M2007006 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 6/6/2025 County: Huerfano Filename: M006-004 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 627G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $217.39 NA NA NA NA NA <br /> Operating cost/hour: $257.76 NA NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA 1 <br /> Ripper own.cost/hour: NA NA NA NA NA NA <br /> Ripper op.cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: $30.90 NA NA NA NA NA <br /> Unit Subtotals: $506.05 NA NA NA NA NA <br /> Number of Units: 2 0 0 0 0 0 <br /> Group Subtotals: Work: $1,012.10 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour:$1,012.10 <br /> MATERIAL QUANTITIE_S <br /> Initial volume: 37,107 CCY Swell factor: 1.215 <br /> Loose volume: 45,085 LCY <br /> Source of estimated volume: 6"over 46 acres at any one time <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Top Soil Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 33.00 LCY Adjusted Capacity: 18.85 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.