My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-24_PERMIT FILE - P2025015 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2025015
>
2025-07-24_PERMIT FILE - P2025015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 8:48:00 AM
Creation date
7/29/2025 8:42:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2025015
IBM Index Class Name
Permit File
Doc Date
7/24/2025
Doc Name
Notice Of Intent
From
Aura Grit LLC
To
DRMS
Email Name
DMC
THM
SMS
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> This prospecting effort will not impact native topsoil.The proposed operations will occur <br /> on abandoned mine waste piles,which generally do not have topsoil. In instances <br /> where our operations do encounter topsoil the plan is as follows.Topsoil will be removed <br /> in a 1ft square located at the point of drilling and placed on a tarp. Following boring and <br /> back fill of the hole the stored topsoil will be placed in its original location and hand tools <br /> will contour to nearly original conditions. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> On the same day of drilling,boreholes will be backfilled with cuttings. Our reclamation <br /> will only consist of backfilling these boreholes with the same material that is extracted <br /> during the drilling process. <br /> 5. Describe how portals,adits, shafts, ponds,excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance <br /> standards). You may wish to contact the Division for closure specifications. <br /> N/A <br /> Form 2-Public File Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.