Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> This prospecting effort will not impact native topsoil.The proposed operations will occur <br /> on abandoned mine waste piles,which generally do not have topsoil. In instances <br /> where our operations do encounter topsoil the plan is as follows. Topsoil will be removed <br /> in a lft square located at the point of drilling and placed on a tarp. Following boring and <br /> back fill of the hole the stored topsoil will be placed in its original location and hand tools <br /> will contour to nearly original conditions. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> On the same day of drilling,boreholes will be backfilled with cuttings. Our reclamation <br /> will only consist of backfilling these boreholes with the same material that is extracted <br /> during the drilling process. <br /> 5. Describe how portals,adits, shafts, ponds,excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance <br /> standards). You may wish to contact the Division for closure specifications. <br /> N/A <br /> Form 2-Public File 14 Page 9 o <br /> 9 f <br />