Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings, ponds,etc. <br /> Scope is to characterize the Aura-Grit uranium waste piles by drilling 43 (31 in S, 12 in N), 3.25 <br /> inch diameter hole borings through the thickness of the pile (max. 50 feet). Drilling stops <br /> when native soil is reached. Boreholes will be logged with a sodium iodide gamma probe. <br /> Shallow subsurface soil samples will be collected at each borehole for offsite analysis. <br /> Boreholes will then be backfilled with cuttings. The assumed total area of disturbance per <br /> borehole is 9 square feet. We do not expect any disturbances to roads as we only plan on <br /> using existing roads with light equipment for short durations. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes,diameter, depth,location,etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Quantity Average Width Average <br /> (ft) Length (ft) <br /> B. Drill Holes: <br /> Quantity 43 Depth (ft) 50 Diameter 3.25 <br /> C. Mud Pits: <br /> Quantity Average Average Average <br /> Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work,including reopening of old workings,advancement of <br /> adits or shafts,trenches,pits,cuts,rock dumps,or other types of disturbance,describe type, <br /> quantity and general dimensions: <br /> N/A <br /> Form 2-Public File Page 6 of 14 <br />