Laserfiche WebLink
2. Predicted Impacts to Hydrologic Balance <br /> The predicted impacts to hydrologic balance will be modeled following the installation of the <br /> groundwater monitoring wells and pursuant collection of baseline water quantity data. <br /> 3. Groundwater Monitoring Plan <br /> Water samples will be collected from 7 sites (3 groundwater, 2 mine workings, and 2 surface) on <br /> a quarterly basis, approximately 3 months apart, shown on the map below. <br /> y <br /> Up-Gradient sv rh z <br /> rx <br /> C-SR-13A rOC <br /> ti <br /> } z <br /> - IBurrD r <br /> (Mine End. TD44N <br /> t Vent Mid Gradient Legend <br /> T044N Alternate <br /> I Drillholc SR-24-3 <br /> FD7:9t• Burro <br /> River n Mine Pngxysed Monitor Well, <br /> Down <br /> trey Ve sa:ary i <br /> Strea 6 Ellison ® Monitor GEMlOmund y r <br /> Decline Moniwring O <br /> u <br /> ., <br /> C-SR-L3 + Bum,Vent Altcmute Mid Q <br /> ., <br /> rat Down Gradient E <br /> Existing GENII Surface ""t 4 <br /> River Up� 1 Monitoring <br /> rz <br /> Strearfl °C <br /> -Existing Mine Workings O <br /> ,.. Q NOT Project Boundary <br /> e Q Additional DOE Lease Areas O <br /> � 4 ;,, $ 0 PLSS Township p <br /> I %: -a '° �d' PLSS SectionIT <br /> _ V1 <br /> 1 U'13N 3t•? " �,7 <br /> T043NR018W <br /> i 0 025 0.5 0.75 1 0 r <br /> Miles <br /> l <br /> Samples will be sent to Pace Analytical Laboratory in Sheridan,Wyoming or an equivalent <br /> certified testing facility.A complete list of analytes is provided in Section 1.2.3 above. The <br /> sampling procedure is provided below in Section 4. Water levels will be measured on a monthly <br /> basis. <br /> A groundwater report will be submitted to the Division on an annual basis containing tabulated <br /> data for all parameters, graphs and plots for selected/relevant parameters, a narrative analysis of <br /> Slick Rock Project Groundwater Sampling and Analysis Plan-2025 <br /> Slick Rock NOI Modification July 2025 <br /> Appendix C Page 27 of 35 <br />