My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-28_REVISION - P2023018
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2023018
>
2025-07-28_REVISION - P2023018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 8:18:09 AM
Creation date
7/29/2025 8:03:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2023018
IBM Index Class Name
Revision
Doc Date
7/28/2025
Doc Name
Request For Modification
From
Highbury Resources Inc
To
DRMS
Type & Sequence
MD1
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Predicted Impacts to Hydrologic Balance <br /> The predicted impacts to hydrologic balance will be modeled following the installation of the <br /> groundwater monitoring wells and pursuant collection of baseline water quantity data. <br /> 3. Groundwater Monitoring Plan <br /> Water samples will be collected from 7 sites (3 groundwater, 2 mine workings, and 2 surface) on <br /> a quarterly basis, approximately 3 months apart, shown on the map below. <br /> y <br /> Up-Gradient sv rh z <br /> rx <br /> C-SR-13A rOC <br /> ti <br /> } z <br /> - IBurrD r <br /> (Mine End. TD44N <br /> t Vent Mid Gradient Legend <br /> T044N Alternate <br /> I Drillholc SR-24-3 <br /> FD7:9t• Burro <br /> River n Mine Pngxysed Monitor Well, <br /> Down <br /> trey Ve sa:ary i <br /> Strea 6 Ellison ® Monitor GEMlOmund y r <br /> Decline Moniwring O <br /> u <br /> ., <br /> C-SR-L3 + Bum,Vent Altcmute Mid Q <br /> ., <br /> rat Down Gradient E <br /> Existing GENII Surface ""t 4 <br /> River Up� 1 Monitoring <br /> rz <br /> Strearfl °C <br /> -Existing Mine Workings O <br /> ,.. Q NOT Project Boundary <br /> e Q Additional DOE Lease Areas O <br /> � 4 ;,, $ 0 PLSS Township p <br /> I %: -a '° �d' PLSS SectionIT <br /> _ V1 <br /> 1 U'13N 3t•? " �,7 <br /> T043NR018W <br /> i 0 025 0.5 0.75 1 0 r <br /> Miles <br /> l <br /> Samples will be sent to Pace Analytical Laboratory in Sheridan,Wyoming or an equivalent <br /> certified testing facility.A complete list of analytes is provided in Section 1.2.3 above. The <br /> sampling procedure is provided below in Section 4. Water levels will be measured on a monthly <br /> basis. <br /> A groundwater report will be submitted to the Division on an annual basis containing tabulated <br /> data for all parameters, graphs and plots for selected/relevant parameters, a narrative analysis of <br /> Slick Rock Project Groundwater Sampling and Analysis Plan-2025 <br /> Slick Rock NOI Modification July 2025 <br /> Appendix C Page 27 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.