My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-28_REVISION - P2023018
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2023018
>
2025-07-28_REVISION - P2023018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 8:18:09 AM
Creation date
7/29/2025 8:03:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2023018
IBM Index Class Name
Revision
Doc Date
7/28/2025
Doc Name
Request For Modification
From
Highbury Resources Inc
To
DRMS
Type & Sequence
MD1
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demw <br /> O � <br /> ixz <br /> 4 F <br /> Fri <br /> Slick,Rock Project.Area <br /> -�- — _. 7 <br /> j f <br /> - <br /> v <br /> & Miles p a <br /> 5 <br /> I" 0 1 2 3 4 �ci <br /> r <br /> Vicinity Map <br /> 1.2.2. Baseline Groundwater Quantity <br /> The baseline groundwater quantity and hydrogeologic model will be available following the <br /> installation of the groundwater monitoring wells and pursuant collection of baseline water <br /> quantity data. <br /> 1.2.3. Baseline Groundwater Quality <br /> The following list of water quality parameters are to be measured.A Technical Revision will be <br /> filed to reduce the analyte list, should that be deemed necessary. <br /> Slick Rock Project Groundwater Sampling and Analysis Plan-2025 <br /> Slick Rock NOI Modification July 2025 <br /> Appendix C Page 12 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.