My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-28_REVISION - P2023018
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2023018
>
2025-07-28_REVISION - P2023018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 8:18:09 AM
Creation date
7/29/2025 8:03:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2023018
IBM Index Class Name
Revision
Doc Date
7/28/2025
Doc Name
Request For Modification
From
Highbury Resources Inc
To
DRMS
Type & Sequence
MD1
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Salt Wash Member 155 1 1 3e-5 1 <br /> Summerville I No data <br /> (1) Lohman, 1965 <br /> (2) EPA, 2017 <br /> 1.2.Baseline Groundwater Characterization <br /> Quarterly samples will be procured for 5 consecutive quarters in order to build an adequate <br /> baseline groundwater characterization. Samples will be taken from the three proposed <br /> monitoring wells, the existing Burro Mine Vent and Ellison Decline, as well as surface grab <br /> samples from upstream and downstream of the river. <br /> Site ID Sample Latitude Longitude Surface Top of Total Scree Compl <br /> Type Elevati Casing Depth ned etion <br /> on Intery Date <br /> al <br /> Up- Well 38.06044 -108.88403 6180 6183 880 5305- TBD <br /> Gradient* 5325 <br /> Mid- Well 38.04657 -108.86822 5858 5861 870 4990- TBD <br /> Gradient* 5010 <br /> Down- Well 38.03729 -108.84389 5765 5768 1000 4765- TBD <br /> Gradient* 5785 <br /> Burro Mine Mine 38.04653 -108.88836 5578 5581 n/a n/a n/a <br /> Vent <br /> Ellison Mine 38.03891 -108.88564 5670 n/a n/a n/a n/a <br /> Decline <br /> River Surface 38.03092 -108.88506 5450 n/a n/a n/a n/a <br /> Upstream <br /> River Surface 38.04404 -108.90580 5430 n/a n/a n/a n/a <br /> Downstream <br /> *Values for these monitor wells represent planned construction parameters and may vary <br /> depending on in-field conditions and other factors encountered during installation. <br /> Five consecutive quarters of water samples were taken from the Burro Vent and Ellison Decline <br /> locations from July 2022 to September 2023 and analyzed for RCRA 8, U&V, Salinity, <br /> Alkalinity, Ca, Mg,Na, and K at the request of DRMS. Subsequently, samples were taken from <br /> the Dolores upstream and downstream locations as well as the Burro Vent and Ellison Decline on <br /> 3/11/25 and were tested for all parameters requested in the DRMS 2023 guidance document. <br /> Slick Rock Project Groundwater Sampling and Analysis Plan-2025 <br /> Slick Rock NOI Modification July 2025 <br /> Appendix C Page 8 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.