My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-14_REVISION - M2017007
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017007
>
2025-07-14_REVISION - M2017007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 8:52:08 AM
Creation date
7/14/2025 8:45:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017007
IBM Index Class Name
Revision
Doc Date
7/14/2025
Doc Name
Notice of Surety Increase
From
Colorado Crushing, Inc. Rockford (Rocky) Ryan
To
DRMS
Type & Sequence
SI1
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: 2025 Reclamation Cost Update Summary <br /> Site: Perrino Pit Permit Action: 2025 Inspection Permit/Job#: M2017007 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 6/26/2025 County: Huerfano Filename: M007-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Grade Hi hwall 1:1 to 31-1:1V 1000'x 25' DOZER 1 11.81 $4,003 <br /> 002 Grade 21-1:1V to 31-1:1V 1000'x 25' DOZER 1 2.55 $863 <br /> 003 Grade Shape 35 acres GRADER 1 21.38 $3,463 <br /> 004 Replace Topsoil 3"over 32.9 acres SCRAPERI 1 26.52 $19,713 <br /> 005 Reve etate 35 acres REVEGE 1 35.00 $43,480 <br /> 006 Mob/De-Mob MOBILIZE 1 6.70 $9,097 <br /> SUBTOTALS: 103.96 $80,619 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,629 <br /> Performance bond: 1.05 Total= $846 <br /> Job superintendent: 51.98 Total= $4,120 <br /> Profit: 10.00 Total= $8,062 <br /> TOTAL O&P= $14,657 <br /> CONTRACT AMOUNT(direct+O&P)= $95,276 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $4,049 <br /> Reclamation management and/or administration: 5.00 $4,764 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $23,970 <br /> TOTAL BOND AMOUNT(direct+indirect)= $104,589 <br />
The URL can be used to link to this page
Your browser does not support the video tag.