Laserfiche WebLink
Mobilization Worksheet Cont'd Task#006 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: PUEBLO <br /> Total one-way travel distance: 55.00 miles <br /> Average Travel Speed: 65.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $8,836.87 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $260.29 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.85 0.85 <br /> Return Time(Hours): 0.85 0.85 <br /> Loading Time(Hours): 0.83 NA <br /> Unloading Time(Hours): 0.83 NA <br /> Subtotals: 3.35 1.69 <br /> JOB TIME AND COST <br /> Total job time: 6.70 Hours <br /> Total job cost: $9,097 <br /> CIRCES Cost Estimating Software <br />