Laserfiche WebLink
Page 80 of 167 <br /> BULLDOZER WORK <br /> Task description: Regrade Upper Sump <br /> Peabody Sage Creek Permit Action: <br /> Site: Mine BondReview Permit/Job#: C2009087 <br /> PROJECT IDENTIFICATION <br /> Task 9: 050 State: Colorado Abbreviation: None <br /> Date: 12/18/2024 County: Routt Filename: 050 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Cat DIOT - IOSU <br /> Machine: <br /> Horsepower: 574 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization % <br /> Ownership $257.39 NA <br /> Cost/Hour: <br /> Operating $196.93 100 <br /> Cost/Hour: <br /> Ripper own. $25.02 NA <br /> Cost/Hour: <br /> Ripper op. $0.00 0 <br /> Cost/Hour: <br /> Operator $38.59 <br /> Cost/Hour: NA <br /> Total unit $517.93 <br /> Cost/Hour: <br /> Total Fleet $517.93 <br /> Cost/Hour: <br /> CIRCES Cost Estimating Software <br />