My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-09_BONDING - C2009087 (2)
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C2009087
>
2025-07-09_BONDING - C2009087 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 10:41:42 AM
Creation date
7/10/2025 10:39:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Bonding
Doc Date
7/9/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
RN3
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 55 of 167 <br /> BULLDOZER RIPPING WORK <br /> Task description: Rip North Facilities Area <br /> Peabody Sage Creek Permit Action: <br /> Site: Mine BondReview Permit/Job#: C2009087 <br /> PROJECT IDENTIFICATION <br /> Task 9: 031 State: Colorado Abbreviation: None <br /> Date: 12/18/2024 County: Routt Filename: 031 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D10T - IOSU Horsepower: 574 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization <br /> Ownership Cost/Hour: $257.39 NA <br /> Operating Cost/Hour: $196.93 100 <br /> Ripper Ownership Cost/Hour: $25.02 NA <br /> Ripper Operating Cost/Hour: $11.73 100 <br /> Operator Cost/Hour: $38.59 NA <br /> Total Unit Cost/Hour: $529.66 <br /> Total Fleet Cost/Hour: $529.66 <br /> MATERIAL QUANTITIES Selected estimating <br /> Area <br /> method: <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 6.00 acres Rip Depth (ft): 1.50 Volum 14,520 BCY or <br /> e: CCY <br /> Source of estimated quantity: Map 2.05.3 M I B <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.