Laserfiche WebLink
Page 53 of 167 <br /> BULLDOZER RIPPING WORK <br /> Task description: Rip North Facilities Parking Area <br /> Peabody Sage Creek Permit Action: <br /> Site: Mine BondReview Permit/Job#: C2009087 <br /> PROJECT IDENTIFICATION <br /> Task 9: 030 State: Colorado Abbreviation: None <br /> Date: 12/18/2024 County: Routt Filename: 030 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D10T - IOSU Horsepower: 574 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization <br /> Ownership Cost/Hour: $257.39 NA <br /> Operating Cost/Hour: $196.93 100 <br /> Ripper Ownership Cost/Hour: $25.02 NA <br /> Ripper Operating Cost/Hour: $11.73 100 <br /> Operator Cost/Hour: $38.59 NA <br /> Total Unit Cost/Hour: $529.66 <br /> Total Fleet Cost/Hour: $529.66 <br /> MATERIAL QUANTITIES Selected estimating <br /> Area <br /> method: <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 2.60 acres Rip Depth (ft): 1.50 Volum 6,292 BCY or <br /> e: CCY <br /> Source of estimated quantity: Map 2.05.3 M I B <br /> CIRCES Cost Estimating Software <br />