Laserfiche WebLink
Bond Review PDYSGCK Page 32 of <br /> 167 <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Motor Water <br /> Area Grader Truck <br /> %Utilization- 100 95 NA NA 25 25 <br /> machine: <br /> Ownership $116.19 $131.26 NA NA $129.81 $111.67 <br /> cost/hour: <br /> Operating $85.60 $95.11 NA NA $22.28 $29.61 <br /> cost/hour: <br /> %Utilization- NA 0 NA NA NA NA <br /> riper: <br /> Ripper own. NA $0.00 NA NA $0.00 $0.00 <br /> cost/hour: <br /> Ripper op. NA $0.00 NA NA $0.00 $0.00 <br /> cost/hour: <br /> Operator $25.24 $36.85 NA NA $27.76 $21.12 <br /> cost/hour: <br /> Unit Subtotals: $227.03 $263.23 NA NA $179.85 $162.40 <br /> Number of Units: 6 1 0 0 1 1 <br /> Group Subtotals: Work: $1,625.41 Support: $0.00 Maint: $342.25 <br /> Total work team cost/hour: $1,967.66 <br /> MATERIAL QUANTITIES <br /> Initial volume: 4,195 CCY Swell factor: 1.090 <br /> Loose volume: 4,573 LCY <br /> Source of estimated volume: Division of Reclamation, Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Pa.. l�weigh! Basis: <br /> Material weight: 2,400 Pounds/LCY <br /> Description: Clay and gravel - Dry <br /> Rated Payload: 82,000 Pounds <br /> Payload Capacity: 34.17 LCY <br /> Truck Bed(volume) Basis: <br /> Struck Volume: 21.60 LCY <br /> Heaped Volume: 31.70 LCY <br /> Average Volume: 26.65 LCY <br /> Adjusted Volume: 31.70 LCY <br /> CIRCES Cost Estimating Software <br />