Laserfiche WebLink
Bond Review PDYSGCK Page 30 of <br /> 167 <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.900 AB.AVG. <br /> Material consistency: 0.900 CAT HB <br /> Dozing method: 1.000 GEN. <br /> Visibility: 1.000 AVG. <br /> Job efficiency: 0.830 1 SHIFT/DAY <br /> Spoil pile: 0.800 FND-RF <br /> Push gradient: 1.000 CAT HB <br /> Altitude: 1.000 CAT HB <br /> Material Weight: 0.868 CAT HB <br /> Blade type: 1.000 PAT <br /> Net correction: 0.4668 <br /> Adjusted unit 653.52 LCY/hr <br /> production: <br /> Adjusted fleet 653.52 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.527/LCY <br /> Total job time: 1.62 Hours <br /> Total job cost: $557 <br /> CIRCES Cost Estimating Software <br />