Laserfiche WebLink
Bond Review PDYSGCK Page 22 of <br /> 167 <br /> MATERIAL QUANTITIES <br /> Initial 2,500 <br /> Volume: <br /> Swell factor: 1.125 <br /> Loose 2,813 LCY <br /> volume: <br /> Source of estimated Division of Reclamation, Mining& Safety <br /> volume: <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 852.6 LCY/hr <br /> production: <br /> Materials consistency Partly consolidated stockpile 1.1 <br /> description: <br /> Average push 0 % <br /> gradient: <br /> Average site 6,800 feet <br /> altitude: <br /> Material weight: 2,650 lbs/LCY <br /> Weight Decomposed rock- 25% Rock, 75% Earth <br /> description: <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 AVG. <br /> Material consistency: 1.100 CAT HB <br /> Dozing method: 1.000 GEN. <br /> Visibility: 1.000 AVG. <br /> Job efficiency: 0.830 1 SHIFT/DAY <br /> Spoil pile: 0.800 FND-RF <br /> Push gradient: 1.000 CAT HB <br /> Altitude: 1.000 CAT HB <br /> Material Weight: 0.868 CAT HB <br /> Blade type: 1.000 PAT <br /> Net correction: 0.4755 <br /> Adjusted unit 405.41 LCY/hr <br /> production: <br /> CIRCES Cost Estimating Software <br />