My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-09_BONDING - C2009087 (2)
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C2009087
>
2025-07-09_BONDING - C2009087 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 10:41:42 AM
Creation date
7/10/2025 10:39:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Bonding
Doc Date
7/9/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
RN3
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond Review PDYSGCK Page 13 of <br /> 167 <br /> MATERIAL QUANTITIES <br /> Initial volume: 48,400 CCY Swell factor: 1.000 <br /> Loose volume: 48,400 LCY <br /> Source of estimated volume: Division of Reclamation, Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Pa. l�wei_ t) Basis: <br /> Material weight: 1,600 Pounds/LCY <br /> Description: Coal - Bituminous, Raw <br /> Rated Payload: 82,000 Pounds <br /> Payload Capacity: 51.25 LCY <br /> Truck Bed(volume) Basis: <br /> Struck Volume: 21.60 LCY <br /> Heaped Volume: 31.70 LCY <br /> Average Volume: 26.65 LCY <br /> Adjusted Volume: 31.70 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 25.53 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 9.200 LCY (heaped) <br /> Bucket Fill Factor: 0.925 Loose material - 1/8" to 3/8" 90 - 95% 0.925 <br /> Adjusted Capacity: 8.510 LCY <br /> Job Condition Corrections: Site Altitude (ft.): 6800 feet <br /> Truck Loader Source <br /> Altitude AdJ: 1.000 1.000 CAT HB <br /> Job Efficiency: 0.830 0.830 CAT HB <br /> Net Correction: 0.830 0.830 <br /> Number of Loading Tool Passes Required 3 passes <br /> Loading Tool Cycle Time: to Fill Truck: <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.