Page 7 of 33 <br /> Adjusted unit 323.59 LCY/hr <br /> production: <br /> Adjusted fleet 323.59 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $1.475/LCY <br /> Total job time: 96.23 Hours <br /> Total job cost: $45,927 <br /> CIRCES Cost Estimating Software <br />