Laserfiche WebLink
Reveg Worksheet Cont'd Task#001 Page 31 of 33 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize/Demobilize Equipment for Site Maintenance <br /> Site: Yoast Mine Permit Action: RN6 Permit/Job#: C1994082 <br /> PROJECT IDENTIFICATION <br /> Task 9: 087 State: Colorado Abbreviation: None <br /> Date: 4/2/2025 County: Routt Filename: RN6 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: I per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL <br /> POWERED, 400 HP (2ND HALF, 2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK <br /> EQUIPMENT TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig 0-25 Tons 26-50 Tons 51+ Tons <br /> Capacities <br /> Ownership Cost/Hour: $10.44 $22.18 $23.94 <br /> Operating Cost/Hour: $26.48 $54.55 $55.65 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $59.44 $122.78 $125.64 <br /> CIRCES Cost Estimating Software <br />