My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-09_BONDING - C1994082 (2)
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1994082
>
2025-07-09_BONDING - C1994082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 10:36:55 AM
Creation date
7/10/2025 10:33:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Bonding
Doc Date
7/9/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Seneca Property LLC
Type & Sequence
RN6
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 29 of 33 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize/Demobilize Equipment for Pond Removal <br /> Site: Yoast Mine Permit Action: RN6 Permit/Job#: C1994082 <br /> PROJECT IDENTIFICATION <br /> Task 9: 086 State: Colorado Abbreviation: None <br /> Date: 4/2/2025 County: Routt Filename: RN6 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL <br /> POWERED, 400 HP (2ND HALF, 2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK <br /> EQUIPMENT TRAILER(25T, 50T,AND IOOT) <br /> Cost Breakdown: <br /> Available Rig 0-25 Tons 26-50 Tons 51+Tons <br /> Capacities <br /> Ownership Cost/Hour: $10.44 $22.18 $23.94 <br /> Operating Cost/Hour: $26.48 $54.55 $55.65 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $59.44 $122.78 $125.64 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner Haul Rig Fleet Haul Return DOT <br /> Description Unit ship Cost/hr/unit Size Trip Trip Permit <br /> (TONS) Cost/hr/ Cost/hr/ Cost/hr/ Cost/fleet <br /> unit fleet fleet <br /> Cat D9T - 9SU 60.01 $253.16 $125.64 1 $378.80 $125.64 $250.00 <br /> Cat 627G 41.80 $217.39 $122.78 1 $340.17 $122.78 $250.00 <br /> Drill/Broadcast 25.00 $41.02 $59.44 1 $100.46 $59.44 $0.00 <br /> Seeder with <br /> Tractor <br /> Subtotals: $819.43 $307.86 $500.00 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.