Laserfiche WebLink
Page 27 of 33 <br /> Drill/Broadcast 25.00 $41.02 $59.44 1 $100.46 $59.44 $0.00 <br /> Seeder with <br /> Tractor <br /> Truck 0.00 $18.48 $59.44 1 $77.92 $59.44 $0.00 <br /> Mounted - 3.0 <br /> in. - 1,700 ft. <br /> capy- <br /> Subtotals: $3,351.13 $991.60 $2,000.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/ Cost/hr/ <br /> fleet fleet <br /> Fuel Tanker, 6x4, 210 $53.90 1 $53.90 $53.90 <br /> HP <br /> Lube Truck, 6x4, 250 HP $53.90 1 $53.90 $53.90 <br /> Flatbed Truck, 6x4, 45K $81.77 1 $81.77 $81.77 <br /> GVW <br /> Light Duty Pickup, 4x4, $24.60 1 $24.60 $24.60 <br /> 1 T. Crew <br /> Subtotals: $214.17 $214.17 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: HAYDEN <br /> Total one-way travel distance: 10.00 miles <br /> Average Travel Speed: 30.00 mph <br /> Total Non-Roadable Mob/Demob Cost * $13,597.41 <br /> two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost ** <br /> ** one round trip,no haul rig: $142.78 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time (Hours): 0.33 0.33 <br /> Return Time (Hours): 0.33 0.33 <br /> Loading Time (Hours): 0.50 NA <br /> Unloading Time (Hours): 0.50 NA <br /> Subtotals: 1.67 0.67 <br /> CIRCES Cost Estimating Software <br />