My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-09_BONDING - C1994082 (2)
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1994082
>
2025-07-09_BONDING - C1994082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 10:36:55 AM
Creation date
7/10/2025 10:33:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Bonding
Doc Date
7/9/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Seneca Property LLC
Type & Sequence
RN6
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 15 of 33 <br /> Return Route: <br /> Seg# Haul Distance Grade Roll. Res Total Res Velocity Travel <br /> Ft % % % f m Time min <br /> 1 1400.00 5.00 3.00 8.00 1931 0.81 <br /> Return Time: 0.81 minutes <br /> Total Scraper team cycle time: 2.94 minutes <br /> Adjusted for job conditions: 962.33 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team (unit)hourly production: 962.33 LCY/Hour <br /> Adjusted multiple scraper team (fleet)hourly production: 1,924.65 LCY/Hour <br /> Unadjusted unit production/hour: 1,183.67 LCY/Hour <br /> Optimal Number of Scrapers per <br /> push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 2 Team(s) Total job time: 73.72 Hours <br /> Unit cost: $1.490 /LCY Total job cost: $211,474 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.