My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-09_BONDING - C1994082 (2)
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1994082
>
2025-07-09_BONDING - C1994082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 10:36:55 AM
Creation date
7/10/2025 10:33:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Bonding
Doc Date
7/9/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Seneca Property LLC
Type & Sequence
RN6
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 33 <br /> Materials Needed: <br /> Geotextile (SY incl. 15% 5,821 <br /> wastage): <br /> Riprap (CY): 0 <br /> Excavation (CY): 1,037 <br /> Costs: <br /> Material Costs: Geotextile $3.30 Riprap (CY): $34.5 Excavation $0.00 <br /> (SY): 0 (CY): <br /> Labor Cost: $0.32 $14.6 $2.84 <br /> 5 <br /> Equipment Cost: $0.00 $15.1 $2.39 <br /> 0 <br /> Means Reference 3132 1916 31 37 1310 3123 1642 <br /> 1510 0100 0310 <br /> Totals: <br /> Geotextile (SY): $21,070.30 <br /> Riprap (CY): $0.00 <br /> Excavation (CY): $5,423.26 <br /> Hours: <br /> Geotextile (SY): 66.52 <br /> 87.50 SY/HR <br /> Riprap (CY): 0.00 <br /> 7.75 CY/HR <br /> Excavation (CY): 25.92 <br /> 40.00 CY/HR <br /> Total Post-Mining Channel Reconstruction 92.44 Hours <br /> hours: <br /> Total Post-Mining Channel Reconstruction $26,494 <br /> Cost: <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.