Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: <br /> Site: Peabody Sage Creek Mine Permit Action: BondReview Permit/Job#: C2009087 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 12/18/2024 County: Routt Filename: C087-000 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Haul Backfill Mat.from Coal Handling Fac.to TRUCKI 2 243.07 $507,983 <br /> Portal <br /> 002 Haul Backfill Material from Utility Pad Area to TRUCKI 3 102.12 $286,655 <br /> Portal Face- <br /> 003 Haul Backfill Material from South Facilities to TRUCKI 2 182.31 $470,866 <br /> Portal Face- <br /> 004 Remove Coal Stockpile Footprint TRUCKI 1 63.46 $158,613 <br /> 005 Regrade Cut Material Over 6.93 ROM Coal Area DOZER 1 46.54 $15,643 <br /> Oil Regrade Cut Material Over covered Storage Pad DOZER 1 6.94 $2,332 <br /> Area <br /> 012 Regrade Drill Pads COV11,CCU31,CCU47, DOZER 1 7.78 $2,676 <br /> CCU58,CCU67,CCU84, <br /> 013 Regrade Drill Pads CCU087 and Septic Drainfield DOZER 1 1.62 $557 <br /> 020 Remove Gravel from North Facilities Parking Area TRUCKI 1 4.99 $9,819 <br /> 021 Remove Gravel from Main North Facilities Area TRUCKI 1 11.51 $22,657 <br /> 022 Remove Gravel from North Facilities Electrical TRUCKI 1 3.07 $6,041 <br /> Shop Area <br /> 023 Remove Gravel from North Office Parking Area TRUCKI 1 0.58 $1,133 <br /> 024 Remove Gravel from South Powder Magazine Pad TRUCKI 1 0.49 $974 <br /> 030 Rip North Facilities Parking Area RIPPER 1 3.24 $1,718 <br /> 031 Rip North Facilities Area RIPPER 1 7.48 $3,964 <br /> 032 Rip North Electrical Shop Facilities Area RIPPER 1 1.99 $1,057 <br /> 033 Rip North Office Parking Area RIPPER 1 0.37 $198 <br /> 034 Rip South Powder Magazine Pad RIPPER 1 0.32 $174 <br /> 035 Rip South Covered Storage Area RIPPER 1 3.74 $1,982 <br /> 040 Rip Haulroad A/A1 Reduction RIPPER 1 8.85 $4,691 <br /> 041 Rip Haulroad B Reduction RIPPER 1 5.98 $3,171 <br /> 042 Rip Haulroad D RIPPER 1 2.61 $1,387 <br /> 045 Regrade Haulroad A/A1 Reduction DOZER 2 32.94 $34,889 <br /> 046 Regrade Haulroad B Reduction DOZER 2 20.62 $21,838 <br /> 047 Regrade Haulroad D DOZER 2 9.93 $10,514 <br /> 050 Regrade Upper Sump DOZER 1 10.36 $5,364 <br /> 051 Regrade Lower Sump DOZER 1 7.40 $3,832 <br /> 052 Regrade Area Ditches GRADER 1 1.03 $262 <br /> 053 Backfill and Regrade Microwave Tower Pad DOZER 1 0.16 $36 <br /> (MR22) <br /> 054 Replace Topsoil on Microwave Tower Pad DOZER 1 0.08 $17 <br /> 060 Replace Topsoil on Coal Handling Facilities Area SCRAPERI 1 30.32 $58,424 <br /> 061 Replace Topsoil on Portal Face-Up Area SCRAPERI 1 46.56 $89,727 <br />