Laserfiche WebLink
Page 13 of 33 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil from Stockpile L to Unreleased Pond 12 Area <br /> Site: Yoast Mine Permit Action: RN6 Permit/Job#: C1994082 <br /> PROJECT IDENTIFICATION <br /> Task#: 046 State: Colorado Abbreviation: None <br /> Date: 4/3/2025 County: Routt Filename: RN6 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/ ush- ull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Scraper Work Team Suport Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Motor Water <br /> Area Grader Truck <br /> %Utilization-machine: 100 NA NA NA 25 25 <br /> Ownership cost/hour: $281.32 NA NA NA $129.81 $111.67 <br /> Operating cost/hour: $319.35 NA NA NA $22.28 $29.61 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA NA NA $27.76 $21.12 <br /> Unit Subtotals: $631.57 NA NA NA $179.85 $162.40 <br /> Number of Units: 4 0 0 0 1 1 <br /> Group Subtotals: Work: $2,526.28 Support: $0.00 Maint: $342.25 <br /> Total work team cost/hour: $2,868.53 <br /> MATERIAL QUANTITIES <br /> Initial volume: 127,255 CCY Swell factor: 1.115 <br /> Loose volume: 141,889 LCY <br /> Source of estimated volume: Division of Reclamation, Mining& Safety <br /> CIRCES Cost Estimating Software <br />