Laserfiche WebLink
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Michael A. Cunningham, Director <br />July 9, 2025 <br /> <br />Mirdanda Kawcak <br />Peabody Sage Creek Mining, LLC <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br /> <br />Re: Proposed Decision <br /> Permit Renewal Application No. 3 (RN-3) <br /> Peabody Sage Creek Mine (Permit No. C-2009-087) <br /> <br />Dear Ms. Kawcak: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package for <br />Permit Renewal No. 3 at the Peabody Sage Creek Mine. Notice of the proposed decision will be published in <br />the Colorado Mountain News Media -Steamboat Pilot as soon as possible. The thirty (30) day public <br />comment period for the Division's decision will begin on the day following the first publication. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved renewal materials <br />were sent to the Office of Surface Mining and the Bureau of Land Management. The materials should be sent <br />within 15 days of final approval. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. The permit will not be issued until the Division has received and approved the <br />bond. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. If you <br />have any questions, please contact me.