My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-08_REVISION - M2011001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011001
>
2025-07-08_REVISION - M2011001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 10:51:32 AM
Creation date
7/8/2025 10:20:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011001
IBM Index Class Name
Revision
Doc Date
7/8/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Julie Mikulas Martin Marietta Materials, Inc.
Type & Sequence
SI3
Email Name
JLE
SMS
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Iverson Mine Permit Action: 2025 Insp Permit/Job#: M2011001 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 6/12/2025 County: Weld Filename: M001-000 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Form Fleet Task <br /> Task Description Used Size Hours Cost <br /> 001 Import Material TRUCKI 1 1,747.38 $5,869,925 <br /> 003 Reve etate 28 Acres REVEGE 1 40.00 $82,172 <br /> 004 Mob/Demob MOBILIZE 1 3.33 $4,168 <br /> SUBTOTALS: 1790.71 $5,956,265 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $120,317 <br /> Performance bond: 1.05 Total= $62,541 <br /> Job superintendent: 895.35 Total= $70,974 <br /> Profit: 10.00 Total= $595,626 <br /> TOTAL O&P= $849,458 <br /> CONTRACT AMOUNT(direct+O&P)= $6,805,723 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.61 Total= $313,744 <br /> Reclamation management and/or administration: 5.00 $340,286 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $1,503,988 <br /> TOTAL BOND AMOUNT(direct+indirect)= $7,460,253 <br />
The URL can be used to link to this page
Your browser does not support the video tag.