Laserfiche WebLink
SURETY INCREASE: <br /> MLI is unsure if the Surety Increase should be included in this Technical Revision,however <br /> MLI will err on the side of caution. <br /> A surety increase was incurred after the inspection in September, 2024. The surety bond in place <br /> at the time was $12,017.00. It was increased to $25,811.00, a difference of$13,794.00.Arrangements <br /> were made to increase it by half($6,897.00) which has been done. Information and formal documents <br /> have been sent to the DRMS Financial Warranty Specialist. MLI will increase the other half as soon as <br /> possible, or once a due date is known. <br /> Thank you for your time and consideration. We apologize for all of the extension requests. We <br /> just wanted to make sure everything was properly in order. We want to remain compliant with all of the <br /> DRMS regulations, and appreciate the help and guidance we've received over our first few years of <br /> being a"Mining-Operator". Please let us know if there is anything else required or needed. <br /> Sincerely, <br /> _(6/2177-= <br /> Marcus Mortensen Brandon Garrison <br /> Owner/President/CEO Operations Manager/CFO <br /> Permittee Proposal Writer/Drafter <br /> Mortensen's Landscape & Irrigation <br /> 5868 Road 106 South <br /> Alamosa, CO 81101 <br /> (719) 580-7006 <br /> peat mine permit# M-1994-081 <br />