Laserfiche WebLink
ilk <br /> win raj <br /> 227311Mar Road <br /> PO Bat 3609 3794 County Road 109 13124 6175 Road 964 CR 631. <br /> 111P lir Grand 70)2bn,CO 81502 6lentro197al704 od 7 49 0 81601 Montrose,CO 81403 Tepalde CO 81435 <br /> 2 4900 480 (970�2/9 1815 (970)728-3775 <br /> A 131114COMPANY Agd1 COMPANY www.united-gj.com <br /> November 1,2023 <br /> High Line Canal <br /> Attn:Dennis Caldwell <br /> 1749 59'h Land <br /> Boone,CO 81025 <br /> RE: Damage Reimbursement Agreement <br /> Two Rivers, Permit# M-1998-038 <br /> Dear Mr. Caldwell: <br /> This letter is being sent to you as part of the permit transfer process that we are working through to <br /> transfer the Two Rivers Pit from Fremont Paving and Redi-Mix,Inc to Oldcastle SW Group,Inc.dba <br /> United Companies.There is no change to the mining or reclamation plans for extraction of the material in <br /> the mine as part of the permit transfer.The mine is located near the intersection of Highway 50 and <br /> Highway 209 in parts of Sections 8, 17,and 18 of Township 21 South,Range 61 West of the 6t6 P.M.in <br /> Pueblo County,CO. <br /> This letter and attached Structure Agreement is being sent to you as part of the permitting process <br /> to address an MLR rule that requires the operator/permittee to pursue an agreement with owners of <br /> any structures within 200 feet of the permit area,in which the operator agrees to reimburse the <br /> structure owner for any damage done to their structure as a result of the mining operation. In lieu of <br /> obtaining an agreement,the operator can provide the state with a Geotechnical study that <br /> demonstrates that any structures within 200 feet of the permit area shall not be damaged by <br /> activities occurring at the mining operation.During the original permitting process operator <br /> completed the study as part of the planning process for this mine,and it indicates that the structures <br /> listed in this agreement will not be damaged by mining activities. <br /> We are sending this agreement to you as required by law,but also because we wanted to inform <br /> you of all the aspects of the MLR rules and also be able to provide you assurances that should <br /> something occur that we do not foresee,Oldcastle SW Group,Inc.dba United Companies will <br /> repair or replace the damaged structure regardless of whether or not the attached agreement is <br /> signed. <br /> Please return this agreement, signed and notarized,within 30 days of receiving it if possible. <br /> Enclosed is a stamped addressed envelope so you can return the executed agreement to us. We have <br /> enclosed a second copy of the agreement for your files. Thank you for your cooperation. <br /> If you have any questions or need more information,please call me at(970)697-7886. <br /> Sincerely, <br /> Oldcastle SW Group,Inc.dba United Companies <br /> ,024,4 <br /> Tyra Bartuska <br /> CO—NM Group Environmental Manager <br /> Mailed via certified mail Item: <br /> -to�� 2I ,20 M00 Th ZT 9800 <br />