Laserfiche WebLink
UIIIN t �- 2273 Rivet Rood <br /> • PO Boa 3809 3794 County Rob 109 13124 6175 Rood 964 CR 63L <br /> mu, Gondol:kik CO 81502 Of917 o7 8Pm4t,CO 81601 Monhoo,CO 81403 TeMuide,CO 81435 <br /> (970►213 1900 M0170/6800 (970►249 1815 (970)728-3775 <br /> A ail COMIWIY ACMCOMPANY www.united-gj.com <br /> November 1,2023 <br /> Century Link <br /> 100 Century Link Drive <br /> Monroe, LA 71203 <br /> RE: Damage Reimbursement Agreement <br /> Two Rivers,Permit# M-1998-038 <br /> To whom it may concern: <br /> This letter is being sent to you as part of the permit transfer process that we are working through to <br /> transfer the Two Rivers Pit from Fremont Paving and Redi-Mix,Inc to Oldcastle SW Group,Inc.dba <br /> United Companies.There is no change to the mining or reclamation plans for extraction of the material in <br /> the mine as part of the permit transfer.The mine is located near the intersection of Highway 50 and <br /> Highway 209 in parts of Sections 8, 17,and 18 of Township 21 South,Range 61 West of the 6'h P.M.in <br /> Pueblo County,CO. <br /> This letter and attached Structure Agreement is being sent to you as part of the permitting process <br /> to address an MLR rule that requires the operator/permittee to pursue an agreement with owners of <br /> any structures within 200 feet of the permit area,in which the operator agrees to reimburse the <br /> structure owner for any damage done to their structure as a result of the mining operation. In lieu of <br /> obtaining an agreement,the operator can provide the state with a Geotechnical study that <br /> demonstrates that any structures within 200 feet of the permit area shall not be damaged by <br /> activities occurring at the mining operation.During the original permitting process operator <br /> completed the study as part of the planning process for this mine,and it indicates that the structures <br /> listed in this agreement will not be damaged by mining activities. <br /> We are sending this agreement to you as required by law,but also because we wanted to inform <br /> you of all the aspects of the MLR rules and also be able to provide you assurances that should <br /> something occur that we do not foresee,Oldcastle SW Group,Inc. dba United Companies will <br /> repair or replace the damaged structure regardless of whether or not the attached agreement is <br /> signed. <br /> Please return this agreement, signed and notarized,within 30 days of receiving it if possible. <br /> Enclosed is a stamped addressed envelope so you can return the executed agreement to us.We have <br /> enclosed a second copy of the agreement for your files.Thank you for your cooperation. <br /> If you have any questions or need more information,please call me at(970)697-7886. <br /> Sincerely, <br /> Oldcastle SW Group,Inc.dba United Companies <br /> Tyra Bartuska <br /> CO—NM Group Environmental Manager <br /> Mailed via certified mail Item: <br /> —1 O f l 2t0.0 00001 —1 l$O ql-?0 <br /> 1 <br />