My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-30_PERMIT FILE - C1981019 (13)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-06-30_PERMIT FILE - C1981019 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 1:57:41 PM
Creation date
7/2/2025 1:48:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
6/30/2025
Doc Name
Tables Maps Figures and Exhibits
Section_Exhibit Name
Volume 15
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF EXHIBITS <br /> <br /> x Revision Date: 9/22/22 <br /> Revision No.: TR-156 <br /> <br />Exhibit 11, Item 1 Wildlife Survey Report for the Collom Permit Study Area, August 25, 2006, <br /> Cedar Creek Associates, Inc. <br /> <br />Exhibit 11, Item 2 2007 Wildlife Monitoring Report for the Collom Permit Study Area, <br /> December 20, 2007, Cedar Creek Associates, Inc. <br /> <br />Exhibit 13C Cumulative Bond Schedule <br /> <br />Exhibit 14, Item 7 Pre-Blast Survey – Structures within ½ Mile of Collom Mining Area <br /> (Pending) <br /> <br />Exhibit 14, Item 8 Pre-Blast Survey – Offering Letters (Pending) <br />Pre-Blast Structure Locations Drawing (Pending) <br /> <br />Exhibit 23, Item 1 Geotechnical Report – Collom Excess (Temporary) Spoil Pile and Pond <br /> <br />Exhibit 23, Item 2 Addendum to Geotehcnial Study for the Collom Excess (Temporary) Spoil Pile <br /> <br />Exhibit 23, Item 3 Geotechnical Report for the Collom out of Pit Dump and Final Reclaimed <br />Surface <br /> <br />Exhibit 23. Item 4 The Adequacy of the Natural Sorted Spoil Material for the Purpose of a Rock <br />Drain in Little Collom Draw <br /> <br />Exhibit 26, Item 1 Alluvial Groundwater Monitoring Well Information <br /> <br />Exhibit 27, Item 1 Groundwater Monitoring Well Information <br /> <br />Exhibit 27, Item 2 Wilson Reservoir Geotechnical Drilling <br /> <br />Exhbiit 27, Item 3 Collom In Pit Drilling <br /> <br />Exhibit 27, Item 5 Collom Facilities Geotechnical Drilling <br /> <br />Exhibit 27, Item 6 Highwall Mining Collom <br /> <br />Exhibit 27, Item 7 Addendum Highwall Mining Collom and South Taylor <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.