Laserfiche WebLink
LIST OF EXHIBITS <br />Volume 16 <br />Exhibit 1, Item 13 Colowyo Mine Permit Boundary Description <br />Exhibit 5, Item 1 A Class III Cultural Resource Inventory for Colowyo Coal Company's Collom <br />Mine Project Moffat and Rio Blanco Counties, Colorado. November 2006, <br />TRC Mariah Associates Inc. <br />Exhibit 5, Item 2 Historic Properties Treatment Plan For Four Sites Within the Proposed Colowyo <br />Collom Mine Expansion Project, Moffat County, Colorado. February 2006, TRC <br />Mariah Associates Inc. <br />Exhibit 5, Item 3 Treatment and Project Plan for Cultural Resources <br />Exhibit 5, Item 4 Terminal Segement of the Haul Road for the Colowyo Coal Company's <br />Proposed Collom Mine Township 4 N, Range 93W, Section 22 <br />Exhibit 5, Item 5 Cultural Resource Site Assessment for Colowyo Coal Company L.P., Collom <br />Expansion Project, Moffat County, Colorado, July 25, 2016 <br />Exhibit 5, Item 6 Collom Power Line Cultural Resource Report <br />Exhibit 5, Item 7 Cultural Resources Discovery Report and Historic Properties Treatement Plan <br />Volume 17 <br />Exhibit 6, Item 7 Collom Area Geology Pre -Feasibility Report <br />Exhibit 6, Item 8 Addendum to the Pre -Feasibility Report <br />Exhibit 6, Item 9 Geology Overburden Chemistry <br />Exhibit 6, Item 10 Geologic Data for Collom Cross Sections — Drill Hole Information <br />Volume 18A <br />Exhibit 7, Item 21 Collom Project Pre -feasibility Hydrology Report, August 2005, Water <br />Management Consultants, Inc. <br />Exhibit 7, Item 2 1 A Collom Monitoring Well Completion Report <br />Exhibit 7, Item 22 Collom Pit Regional Hydrogeologic Model Model, 2006, Water Management <br />Consultants, Inc. <br />Exhibit 7, Item 22A Alluvial Valley Floor Documentation <br />Exhibit 7, Item 22B Collom Pit Dewatering Study Agapito Assoicates, Inc. <br />Volume 18B <br />Exhibit 7, Item 23 Sediment Control Plan Parts A — I <br />Viii Revision Date: 10/23/17 <br />Revision No.: TR -116 <br />