My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-30_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-06-30_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 8:58:44 AM
Creation date
7/2/2025 1:37:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
6/30/2025
Doc Name
Performance Standards
Section_Exhibit Name
Volume 15 Rule 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />Collom – Rule 4, Page 23 Revision Date: 4/28/22 <br />Revision No.: TR-154 <br />4.30 CESSATION OF OPERATIONS <br />4.30.1 Temporary <br />If, for any unforeseeable circumstances, temporary cessation of mining and reclamation operations at the <br />Colowyo operation becomes necessary for a period of thirty (30) days or more, Colowyo will submit to <br />the Division a notice of intention to temporarily cease or abandon mining and reclamation activities. This <br />notice will include a statement of the exact number of acres that will have been affected in the permit area <br />prior to temporary cessation and an identification of back filling, regrading, revegetation, environmental <br />monitoring, and water treatment activities that will continue during temporary cessation. <br />4.30.2 Permanent <br />At the permanent conclusion of surface mining operations, Colowyo will close, backfill, or otherwise <br />permanently reclaim all affected areas. The reclamation plans are set forth in Section 2.05.5. The <br />projected post-mining topography is set forth on the Post-mining Topography map (Map 19C). <br />Colowyo will remove any equipment, structures, or other facilities at the conclusion of mining activities <br />and will reclaim the affected land. Structures that are identified by the landowner to be necessary to <br />conduct post mining activities will be designated at the time of final bond release.
The URL can be used to link to this page
Your browser does not support the video tag.