My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-01_REVISION - C1981041 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2025-07-01_REVISION - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 8:09:39 AM
Creation date
7/1/2025 3:35:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/1/2025
Doc Name
Midterm Review Document
From
DRMS
To
Tonya Hammond -Snowcap Coal Company, Inc.
Type & Sequence
MT9
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPACTION WORK <br /> Task description: TR69 Compacting fill in excavated hole <br /> Site: Roadside Portals Permit Action: 2024 BCI Revised Permit/Job#: C1981041 <br /> PROJECT IDENTIFICATION <br /> Task#: 213 State: Colorado Abbreviation: None <br /> Date: 8/l/2024 County: Mesa Filename: C041-213 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 825H Horsepower: 354 <br /> Compactor Type: Soil-tamping foot Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $164.53 NA <br /> Operating Cost/Hour: $161.21 100 <br /> Operator Cost/Hour: $31.50 NA <br /> Total Unit Cost/Hour: $357.24 <br /> Total Fleet Cost/Hour: $357.24 <br /> MATERIAL QUANTITIES <br /> Loose volume: 1,100 LCY Shrinkage factor: 0.875 <br /> Compacted volume: 963 CCY <br /> Source of estimated volume: TR69 SCC estimate <br /> Source of estimated shrinkage factor: Cat Handbook <br /> HOURLY PRODUCTION Unadjusted hourly production=(W x S x L x Q/P <br /> Compacted width per pass(W): 7.34 feet <br /> Average Compactor Speed(S): 1.00 mph <br /> Compacted thickness of each lift(L): 3.00 inches <br /> Conversion Constant(C): 16.3 (5,280ft./12in./27cu.ft.) <br /> Required number of machine passes(P): 2 passes <br /> Unadjusted Hourly Unit Production: 179.46 CCY/hour <br /> Job Condition Correction Factors Site Altitude: 5,100 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.8300 multiplier <br /> Adjusted Hourly Unit Production: 148.95 CCY/Hour <br /> Adjusted Hourly Fleet Production: 148.95 CCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Compactor(s) Total job time: 6.46 Hours <br /> Unit cost: $2.398 per CCY Total job cost: $2,308 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.