My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-30_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-06-30_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 1:28:49 PM
Creation date
7/1/2025 9:32:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
6/30/2025
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
Rule 4 Performance Standards
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-50 Revision Date: 4/9/25 <br /> Revision No.: MR-261 <br />structures. Colowyo’s design criteria has been developed in association with the Avian Power <br />Line Interaction Committee’s (APLIC) Suggested Practices for Raptor Protection on Power <br />Lines: “The State of the Art in 1996” (APLIC 1996). Please refer to the Figure 4.18-1 - Raptor <br />Protection Retrofitting of Existing Power Poles. For structure configurations and retrofitting <br />locations, please refer to Figure 4.18-2 through 4.18-6, and Maps 22A and 22B. The following <br />schedule will be used to update existing power poles with adequate raptor protection in accordance <br />to the guidelines. <br /> <br />As part of Colowyo’s Avian Protection Plan effort, EDM examined the distribution structures in <br />July 2002 to identify pole configurations that present a risk to perching raptors and other large <br />birds. EDM also conducted a reconnaissance of the 69kV power lines to record the overall <br />structure configurations and determine if any of these configurations present an electrocution risk <br />to area raptors. Additional transmission and distribution power lines located in and adjacent to the <br />Colowyo Coal Mine are owned and operated by White River Rural Electric Association, Tri-State <br />Generation and Transmission, and Western Area Power Administration. The operation of these <br />lines fall under the jurisdiction of each of these respective utilities and agencies. <br /> <br />Distribution lines (less than 69 kilovolts {kV}) are of lower voltages than transmission lines and, <br />therefore, have reduced hardware and equipment clearances. Depending on the pole configuration, <br />perching on distribution line poles (particularly by juvenile birds) increases the potential of a bird <br />connecting phase-to-phase or phase-to-ground, which typically results in bird mortalities and often <br />leads to increased power outages. Although most of the 69kV structures examined during the July <br />2002 field survey were of sufficient clearance for eagles and other raptors, thereby minimizing any <br />electrocution risk, a few 69kV structure configurations were identified that could represent an <br />increased hazard. Two such configurations recorded included Gang Operated Air Brake Switches <br />(GOABS) where the center phase switch was located less than 60 inches from the pole-top ground <br />wire. The second 69kV configuration of concern included structures where the center phase <br />jumper was placed on a crossarm insulator in close proximity to the pole-top ground wire. <br /> <br />Colowyo is responsible for several miles of additional distribution lines on the mine that were not <br />surveyed as part of the July 2002 study. However, these lines are currently de-energized, and the <br />structures are scheduled for long-term removal as the mining operation expands and areas are <br />reclaimed. In addition, a portion of the existing 4160 volt line located along the Taylor Creek <br />drainage traveling south of the Taylor Pump Holding Pond were previously retrofitted to address <br />the potential risk of raptor electrocution. <br /> <br />As described in Section 2.05.6, all disturbed acreage, including roads, has been kept to a minimum <br />by proper planning to reduce impacts to all environmental resources, including impacts on wildlife. <br /> <br />Colowyo's objective of returning the post-mining land use to a rangeland condition capable of <br />supporting the diverse wildlife populations is being approached in several ways. As described in <br />Section 2.04.11, Colowyo initiated efforts to restore wildlife habitats during premine planning and <br />early mining, by conducting an extensive four-year study to assist in determination of the best <br />techniques for revegetating disturbed areas with native species to enhance wildlife habitat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.